ISO 80079-34 Certification — Explosive Atmospheres

Quality systems for equipment in explosive atmospheres.

Who this standard is for

Manufacturers of equipment for use in explosive atmospheres, where the quality system is a condition of placing the product on the market.

Why organisations seek it

Certification is rarely pursued for its own sake. In the Gulf it is usually triggered by something specific and dated — a tender, a buyer audit, a regulator, or a parent company rolling out a group standard. Knowing which of these applies matters, because it sets the deadline and it decides how wide the scope needs to be.

  • A tender or pre-qualification form that names the standard
  • A main contractor requiring it from subcontractors before mobilisation
  • A multinational buyer applying group-wide supplier requirements
  • A regulator or authority expecting a managed system for the activity
  • A client incident or complaint that put the management system under scrutiny
  • Entering a new market where buyers treat certification as the baseline

Sectors that most often certify

  • Electrical equipment manufacturing
  • Instrumentation
  • Oil and gas equipment
  • Mining equipment

What the standard requires

  • A quality system covering the manufacture of Ex equipment specifically
  • Controls ensuring product continues to conform to the certified type
  • Control of the critical characteristics identified in the type examination
  • Traceability of components affecting the explosion protection concept
  • Competence requirements for personnel performing Ex-critical operations

Evidence auditors typically ask for

  • Links between production controls and the type examination certificate
  • Component traceability for Ex-critical parts
  • Routine verification and test records
  • Personnel competence records for Ex-related tasks
  • Nonconformity and concession records affecting Ex characteristics
Common pitfall: Treating it as general ISO 9001. The audit focuses narrowly on whether production still matches the certified type, which is a different question from whether the factory is well run.

Documents you will need

Most organisations already hold more of this than they expect — it exists as ordinary operational records that were never labelled for an audit. The work is usually assembling and connecting it, not creating it from nothing.

  • A scope statement naming the activities and sites to be certified
  • The policy for the management system, signed and communicated
  • Measurable objectives, with evidence of actual measurement against them
  • Documented processes or procedures matching how the work is really done
  • Internal audit programme, reports, and the findings raised from them
  • Management review minutes covering the inputs the standard requires
  • Corrective action records showing findings through to closure
  • Competence and training records for the people in scope

Internal audits and a management review must have genuinely taken place, with records, before a Stage 1 audit. This is the single most common reason an organisation is found not ready.

Findings auditors raise most often

Across management system audits the same handful of findings account for most nonconformities. None of them is about the standard being hard to understand. All of them are about the gap between a documented system and an operated one.

  • Internal audits not completed, or not covering the whole scope
    The programme exists on paper but some processes have never been audited. The standard expects the whole system to be covered across the cycle.
  • Management review missing required inputs
    A meeting took place, but the minutes do not cover the inputs the standard lists — audit results, customer feedback, objective performance, corrective action status, resource needs.
  • Objectives that cannot be measured
    An objective such as "improve quality" has no measure, so there is no way to show whether it was met. The standard asks for objectives that are monitored.
  • Corrective actions raised but never closed
    Findings are logged, an action is assigned, and nothing records whether it worked. Correction without verification is an open finding.
  • Documents describing a process nobody follows
    The auditor compares the document to the practice. Where the real process differs, the gap is the finding — and fixing the document rather than the process rarely survives the next audit.

How certification works

  1. Choose the standard and scope
    The scope statement decides what the certificate actually covers, so it is worth getting right before anything else. It names the activities, and the sites, that are being certified.
  2. Submit your documentation
    Your management system documentation is reviewed against the standard. Gaps are identified at this point rather than during the audit, which is where most delays otherwise occur.
  3. Stage 1 audit
    A readiness review. The auditor confirms that the system is documented, that internal audits and management review have taken place, and that you are ready to be assessed against practice.
  4. Stage 2 audit
    The implementation audit. The auditor tests whether the system described is the system being operated, by examining records and interviewing the people who do the work.
  5. Certification and surveillance
    Once any findings are closed, the certificate is issued and listed for verification. Certificates run on a three-year cycle with annual surveillance audits to keep them valid.

How long it takes

The honest answer is that it depends on readiness rather than on the certification body. Once documentation is complete and the system has been operating, the audit stages move quickly. The phases below are sequential, and the first is the one that varies most.

PreparationBuilding or finishing the management system, then running at least one internal audit and one management review. This is where the schedule is won or lost, and it is entirely within your control.
Documentation reviewYour documentation is assessed against the standard. Gaps are identified here rather than during the audit, which is where delays otherwise begin.
Stage 1 — readinessThe auditor confirms the system is documented, that internal audits and management review have taken place, and that you are ready to be assessed against practice.
Stage 2 — implementationThe implementation audit. The auditor tests whether the system described is the system operated, by examining records and interviewing the people doing the work.
Decision and issueAny findings are closed, the certification decision is taken independently of the audit team, and the certificate is issued and listed for verification.

Pricing

Annual certificationThree-year term
$3,500 / AED 12,854 per year $9,450 total for three years

Published prices, billed as a subscription. Certifying more than one standard together reduces the combined price. Final scope may affect the price where multiple sites or high headcount are involved.

Accreditation and verification

What gives a certificate its value is the body standing behind it. A certificate issued by a body accredited by an International Accreditation Forum member is listed on the IAF CertSearch global registry, where any client or procurement team can confirm it in seconds. Always ask which accreditation body sits behind a certificate, not just who issued it.

Frequently asked questions

How long does ISO 80079-34 certification take?

It depends on how ready your management system is and on the scope being certified. Once documentation is complete and reviewed, the two audit stages usually move quickly — gaps found at Stage 1 are the most common cause of delay.

Is ISO 80079-34 certification internationally recognised?

A certificate issued by a body accredited by an International Accreditation Forum member is internationally recognised, and anyone can confirm it on the IAF CertSearch global registry.

How long does the certificate stay valid?

Certificates run on a three-year cycle, subject to passing an annual surveillance audit. If surveillance is not carried out, the certificate can be suspended or withdrawn before the cycle ends.

Do we need a consultant?

Not necessarily. Many organisations prepare their explosive atmospheres system in-house, particularly where processes are already documented. A consultant helps when time is short or the scope is complex, but is not a requirement for certification.

Combining with other standards

Certifying several standards together as an integrated management system shares the scope, the internal audit programme, the management review and much of the audit itself. It reduces both the combined price and the internal effort, and it avoids maintaining parallel sets of documentation that drift apart.

Related standards

Also available for

Ready to start?